Dyer Engineering

Silverstone BC were commissioned by Dyer Engineering to produce schedules of condition relating to four buildings at their Annfield Plain site. The nature of the transaction dictated that the reports were required in a quick turnaround period which was met by the SBC team.
Client: Dyer Engineering
Role: Schedule of Condition
Business Type: Industrial
Value: 30,000 sq ft area